Date: September 2011
DRY DOCK # 2 – PORT of NAPLES
For the final design of renovation of the dry dock # 2 within the port of Naples, the XIX century, were performed a number of geotechnical surveys in continuous drill, instrumented with logging services surveys continue (DAC), in foro S.P.T penetration tests and seismic testing hole "down-hole", besides C.P.T penetration tests and permeability tests Lugeon tests (in rock) and Lefranc (loose); the investigations have made it possible to characterize, in addition to tax land, even the walls that make up the system and to define in detail the best interventions for its rehabilitation and full recovery.
Download
– A Lugeon tests test report
– A test report Lefranc
– Summary of in situ tests
– Stratigraphy of a survey with Cpt's profile